by support » 25 January 2012, 08:37
When we said "before the end of this year", we betted that only one interface sample would be enough to start the production.
After first sample, we decided to change leds and buttons in order to have a more professional interface.
And unfortunately, the second sample was 3mm to high (mistake in factory), then we decided to do not take the risk to start production without having one more sample with correct height.
The third sample, which arrived in our hands one week ago, looks 100% ready for production.
We just need some more days to double check the electronic part, then we will start production.
Sorry for this extra delay, but we prefered to delay this item until we can propose the best we can do.
The Lighting Controller